All projects

PROJECT / BUS FLEET / DAILY DISPATCH PLANNING

AUTODISP.
Daily roster planning.

Developed for State Unitary Enterprise Passazhiravtotrans. The system prepares a daily bus and driver schedule, validates constraints and lets the dispatcher adjust assignments when operating conditions change.

DAY PLAN BUS FLEET
ROUTESBUSES+DRIVERS

Developed for a Passazhiravtotrans challenge. The public repository documents the scheduling engine and demonstration scenarios.

Duty assignmentsRest standardsChanges during the day

Plan daily dispatch.
Meet the constraints.

A daily roster links routes, buses and drivers. Buses may be under maintenance or out of service; drivers may be absent or awaiting medical clearance and must comply with work and rest requirements. One invalid assignment can affect other shifts.

AUTODISP turns this process into a verifiable calculation. It generates a schedule and explains why a bus or driver was assigned to a particular duty, or why a duty could not be covered.

From source records
to a daily schedule.

The system combines operator data, calculates daily dispatch and lets the dispatcher review and adjust the result.

01 / COLLECT DATA

Fleet status

Import CSV or Excel records covering bus availability, shifts, leave, sick days and medical examinations.

02 / CHECK

Constraints

Identify inconsistencies in the input data and exclude assignments involving an unserviceable bus or a driver without clearance.

03 / CALCULATE

Daily roster

Assign buses and drivers to routes and shifts while accounting for rest requirements and priorities.

04 / CHANGE

Respond to disruptions

When a bus is withdrawn from service, an accident occurs or a driver is absent, review replacement options and the consequences of each choice.

The calculation can continue over a series of days, storing shift history and driver rest requirements.

Bus withdrawn from service.
Roster recalculation.

In the published demonstration, the system first generates a schedule for one depot. At 08:40, a bus is withdrawn from service. The system proposes up to three replacements, assesses each option, explains its preferred choice and recalculates the schedule. The event remains in the log.

08:40Bus withdrawal
OPTIONSEvaluated replacement
NEW PLANRoster and event log

Validation
methodology.

Comparison of approaches

The repository includes two models of manual assignment. They provide baselines for comparing AUTODISP schedules when buses or drivers are in short supply.

Disruption scenarios

The validation scenarios cover bus withdrawal, road accidents, drivers without clearance and other changes during the day.

Schedule validation

Separate checks identify invalid assignments and constraint violations before issuing a result.

The public documentation confirms these checks. It does not establish that the simulation results represent measured effects in an operating bus depot.

Scheduling engine.
Further validation required.

The public repository provides code, a scenario description and sample data. Some demonstration materials are based on an internal operator reference, so the complete generator page is not proposed for open publication.

The README does not confirm production use or a measured effect on actual daily scheduling. That would require testing on the operator’s records and comparing the results with the existing process.

Description and launch of the project on GitHub

Planning required
daily bus dispatch?

Let us discuss the input data and constraints, then test the solution in a practical scenario.